Got a full 12 hours into the downstairs bathroom, great fun.
Wired and one sheet of drywall up.
Posted from WordPress for Android
Category: Remodeling
Plumbing – Saturday February 19, 2011
Added some pictures to harrylange.com showing our new plumbing. We have a lot more water pressure and it’s caused a couple of problems. Going to have a new drain system added to upstairs bath tub. More money, however this will give us a complete update.
Plumbing – Wednesday February 9, 2011
The house re-plumbing is going really well. Tonight we are using the new water lines in the whole house. We have new water lines from the water meter and throughout the house.
I think all that is left is to hook up the two new toilets and replace the drain line for the upstairs sink. We are green, 1.28 gallon toilets at$230.00 each. Being green is hard and expensive. I did have to cut out some more walls so Tim can change out the sink drain. The current drain is 1 1/4 inch and the current code requires 1 1/2 inch line. This means he will need to run the new 1 1/2 inch line closer to the drain vent. I’ll add more pictures to the website this weekend (that’s my goal anyway). Now all I have to do is drywall the upstairs and downstairs bathrooms.
Happy Birthday Brian!!! !!!! If the phone rings at 00:01, no need to answer it’s just me. Love ya.