It is time to move on.
The construction activity is getting closer and closer to our motor home. They are moving dirt into the parking lot within 40 feet of where we are camped and the dust they are creating is becoming a problem. I thought I’d walk up to the construction shack and find out if they are working a 4 or 5 day work week. Since no one from this project has actually walked down to this end of the parking lot I thought I’d also point out they were about to start dumping dirt into the stream which comes under and along the road.
The dump truck driver fly’s into the parking lot backs up and dumps, never looking to see where the stuff he is dumping is actually going. To the right of this picture the dirt goes all the way back to where the stream is along the road way.
It is not a big stream however it does run all year around so blocking it off would create a problem for them.
The guy ( I think Carl ) in the construction shack was not the most personable person I’ve ever talked too. He said they are going to be working Monday – Friday all summer. He was not happy when I told him about the small stream and all he really wanted to do was argue about how there wasn’t a stream at that end of the parking lot. He was even more unpleasant when I showed him were the stream is located. Oh well, I guess being nice and friendly with other people is not a priority in our current way of communicating, I should of sent him a Facebook IM.